AN30G Power Systems for AIX - PowerVM I Implementing Virtualization

Questo corso appartiene alla linea: IBM
Durata: 5 Giorni
Costo: € 2.000,00
Iva esclusa Condividi
AN30G
Prossime edizioni
Data Sede
03-07-2017 Roma
02-10-2017 Bologna
06-11-2017 Milano
11-12-2017 Roma

A chi è rivolto il corso?

This advanced course is appropriate for System Administrators, Technical Support Personnel, and Business Partners responsible for implementing LPARs on IBM Power Systems with AIX servers.

Descrizione:

This course provides an overview of the PowerVM edition's features on POWER6 and POWER7 processor-based systems. It explains the new features and benefits of virtualization including processor virtualization, Integrated Virtual Ethernet, Virtual I/O Server, and virtual devices, such as virtual Ethernet, virtual SCSI, and virtual Fibre Channel adapters. Basic and advanced configurations of the Virtual I/O Server and its clients are discussed including various availability options.

Expand your knowledge about PowerVM features that were introduced in Power Systems for AIX I: LPAR Configuration and Planning (AN110) / Power Systems for AIX I: LPAR Configuration and Planning (ILO) (AX110).

This course provides lectures and hands on labs in an instructor lead course environment, either in a face-to-face classroom or in a live virtual classroom environment (ILO - Instructor Led Online).

Objectives:
  • Discuss the advantages or value of PowerVM edition's features
  • Define micro-partitioning and shared processor LPARs
  • Discuss the benefits of simultaneous multithreading
  • Discuss and configure the Integrated Virtual Ethernet (IVE)
  • Install and configure the Virtual I/O Server
  • Configure virtual network devices, such as virtual Ethernet and shared Ethernet adapters
  • Configure virtual SCSI and virtual Fibre Channel storage adapters
  • Configure virtual SCSI target devices on a virtual SCSI adapter
  • Define file-backed storage pools and file-backed virtual optical devices
  • Identify single points of failure in virtualized environments
  • Configure multiple VIO servers for high availability
  • Configure advanced virtual networking options
  • Configure the shared Ethernet adapter failover feature
  • Configure advanced virtual SCSI options
  • Configure MPIO in a VIO server's client partition
  • Manage the service events, configure call home, add, exchange FRUs, and discuss FSP failover
  • Perform PowerVM (VIOS) Maintenance
PreRequisites:

You should have advanced system administration experience with AIX 5.3 or later. This prerequisite may be met by attending one of the following courses:

  • Power Systems for AIX II: AIX Implementation and Administration (AN120) or Power Systems for AIX II: AIX Implementation and Administration (ILO) (AX120)
  • AIX Jumpstart for UNIX Professionals (AN140) or AIX Jumpstart for UNIX Professionals (ILO) (AX140)
  • or you must have equivalent AIX and LPAR skills.

General TCP/IP knowledge is strongly recommended. This prerequisite may be met by attending AIX 5L TCP/IP I: Configuration (AU070) or TCPIP for AIX Administrators (AN210) / TCPIP for AIX Administrators (ILO) (AX210).

You are also expected to have logical partition administration skills on POWER6 or POWER7 processor-based systems, which can be obtained by attending Power Systems for AIX I: LPAR Configuration and Planning (AN110) or Power Systems for AIX I: LPAR Configuration and Planning (ILO) (AX110).

Topics:

Day 1

  • Unit 1: Introduction to partitioning
  • Exercise 1: Power System documentation overview
  • Unit 2: Processor virtualization
  • Exercise 2: Processor virtualization configuration

Day 2

  • Unit 3: Integrated Virtual Ethernet
  • Exercise 3: Integrated Virtual Ethernet configuration
  • Unit 4: Virtual Ethernet
  • Exercise 4: Virtual Ethernet Adapter configuration
  • Unit 5 - Topic 1: Virtual I/O Server and virtual devices
  • Exercise 5 - Topic 1: Virtual I/O Server and client partition configuration

Day 3

  • Unit 5 - Topic 2: Virtual I/O Server and virtual devices
  • Exercise 5 - Topic 2: Virtual I/O Server and client partition configuration
  • Unit 6: Virtual network configurations with dual VIOS
  • Exercise 6: Shared Ethernet adapter failover setup

Day 4

  • Unit 7: Virtual SCSI configurations with dual VIOS
  • Exercise 7: Dual VIO servers configuration with MPIO in the client partition
  • Unit 8: N_Port ID Virtualization
  • Exercise 8. Virtual Fibre Channel adapter configuration
  • Unit 9: Migration from Physical to Virtual Storage

Day 5

  • Unit 10: HMC Service Management.
  • Exercise 9: Manage Service Events
  • Unit 11: PowerVM advanced systems maintenance
  • Exercise 10: PowerVM system maintenance
  • Exercise 11: (Optional) file-backed virtual disk and virtual media repository configuration

Dotazione:
Each participant will have a station set up with operating systems and software needed for the exercises.

0 commenti trovati
Per lasciare un commento devi effettuare il Login con lo username e la password che ti sono stati inviati quando ti sei iscritto ad uno dei nostri corsi.